RSA Calendar
2002

next year

January

Sun Mon Tue Wed Thu Fri Sat
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25
Status Meeting (1/25/02)
26
27 28 29 30 31    

February

Sun Mon Tue Wed Thu Fri Sat
27 Jan 28 29 30
Herb on-site help
31
Herb on-site help
1
Herb on-site help
2
Darien on-site help
3
Darien on-site help
4 5 6 7 8 9
10 11 12 13 14
Status Meeting
15
Info on two-heads sent to LM (Wakefield)
16
17 18
Joe on-site help
19
Joe on-site help
20
Joe on-site help
21
Joe on-site help
22
Joe on-site help
23
24 25
Darien on-site help
26
Darien on-site help
27
Darien on-site help
28    

March

Sun Mon Tue Wed Thu Fri Sat
          1 2
3 4 5 6 7
Deliver rsa_512k
8 9
10 11 12 13 14 15 16
17 18
Start of testing dry run

Delivered rsa_512l

19
Joe Wakefield on site help
20
Joe Wakefield on site help
21
Joe Wakefield on site help
22
Joe Wakefield on site help
23
24 25
Continued testing dry run
26
Darien on-site help
27
Darien on-site help
28
Darien on-site help
29
Darien on-site help
30
31            

April

Sun Mon Tue Wed Thu Fri Sat
  1 2 3
Darien on-site help
4
Darien on-site help
5
Darien on-site help
6
7 8 9 10 11
rsa-512m delivery (via email)
12 13
14 15
Susan on-site help
16
Susan on-site help
17
Susan on-site help
18
Susan on-site help
19
Susan on-site help
20
21 22
Joe on-site help
23
Joe on-site help
24
Joe on-site help
25
Joe on-site help
26
Joe on-site help
rsa_512n delivery
27
28 29 30
7.2 RH upgrade on ws1-avs
RSA 5.1.2 merged into RSA 5.2.2
       

May

Sun Mon Tue Wed Thu Fri Sat
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21
Ensco/LM onsite design discussion
22
rsa_512o delivery
23 24
end of ENSCO/LM onsite design discussions
25
26 27 28 29 30 31
Delivery of user guide, smm docs
 

June

Sun Mon Tue Wed Thu Fri Sat
            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20
AWIPS 5.2.2 RSA 5.2.2 merge
21 22
23 24 25 26 27 28 29
30            

July

Sun Mon Tue Wed Thu Fri Sat
  1 2 3 4 5 6
7 8 9
onsite TIM
10
onsite TIM
11
onsite TIM
12 13
14 15 16 17 18 19 20
21 22
bdds/orpg running mdorpg
23 24
Upgraded DS to RH 7.2
25 26
Installed RSA5.2.2 with ER localize
27
28 29 30 31
Storing ORPG data on mdorpg
     

August

Sun Mon Tue Wed Thu Fri Sat
        1 2 3
4 5 6 7 8 9 10
11 12
Status meeting
13
New designs posted
14 15 16 17
18 19 20 21 22
LDAR ingest reqs review
23 24
25 26 27 28 29
RSA 5.1.2R delivered
30 31

September

Sun Mon Tue Wed Thu Fri Sat
1 2 3 4 5 6 7
8 9 10 11 12
LPLWS reqs review
LDAR design review
13
5.2.2 staged
14
15 16
Status meeting
17 18 19 20
LLP (CGLSS) reqs review
21
22 23
CDR ENSCO
24
CDR ENSCO
5.2.2 Charlotte
25
CDR ENSCO
5.2.2 Charlotte
26
5.2.2 Charlotte
27
5.2.2 Charlotte
28
29 30          

October

Sun Mon Tue Wed Thu Fri Sat
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18
5.2.2 install
19
20 21 22 23 24 25
Staged 7.3 on ws1
26
27 28
Staged 7.3 on ds1
29
Install software using 7.3
30 31    

November

Sun Mon Tue Wed Thu Fri Sat
          1 2
3 4
VAFB training
Patrice, Woody
5
VAFB training
6
VAFB training
7
VAFB training
8
5.2.2a staged and testing
9
10 11 12 13 14 15 16
17 18 19
Delivered RSA 5.2.2a
20 21 22 23
24 25 26 27 28 29 30

December

Sun Mon Tue Wed Thu Fri Sat
1 2 3 4 5 6
522a_2 patch
7
8 9 10 11 12 13 14
15 16 17 18 19
522a_3 patch
20 21
22 23 24 25 26 27 28
29 30 31        

next year